Regardless of which method you use to initially route the day's work, you may find situations where you need to move a few jobs for whatever reason. In such a situation, it would be best to manually re-order the jobs. To do this, make sure you are viewing the correct date on the dispatch board then hover over Actions and select "Manual":

mceclip0_-_2020-11-11T102738.192.png 

Then you can hover over the far left side of the grid to reveal blue, double-sided arrows:

mceclip1_-_2020-11-11T102756.787.png

Use the arrows to drag and drop the jobs to a different position. You can also type in the Order field to re-route. When you are finished with your adjustments, use the yellow bar at the top of the grid to save your changes:

mceclip2__75_.png

 

 

 